The CRL and North Shore Line Redux

A (re)Look at Two Particular Heavy Rail Projects

 

Over the last year advancements have been made on Auckland‘s heavy rail system (for both passengers and freight). BR:AKL has been following developments as Auckland’s rail continue to grow and evolve through the 21st Century. With the next step of the City Rail Link under way – that is the Notice of Requirements (protecting the land route for the CRL); BR:AKL takes a quick look back at some rail posts, in particular the operational model post CRL but pre North Shore Line, and The North Shore Line herself.

 

The Redux

Operational Models – An Alternative Proposal Post CRL, but pre North Shore Line (thus far)

CRL TIMETABLE AND OPERATION PLAN

THE PROPOSAL After seeing one or two particular proposals for CRL Timetable and/or Operations (that is how passenger trains would run along the Auckland Rail Metro Network) I thought to myself if I could come up with my own proposal.

 

CRL TIMETABLE AND OPERATION PLAN – PART TWO

THE CRL TIMETABLE/OPERATION FREQUENCY PLAN

 With the baseline operation plan laid out (so basically one train an hour on each of the three lines in each direction) it was time to ramp the frequencies up to acceptable standards

 

CRL TIMETABLE AND OPERATION PLAN – PART THREE

POTENTIAL PASSENGER CAPACITY ON POST CRL RAIL NETWORK So far in my City Rail Link Timetable and Operation Plan Proposal I have covered the foundation of my proposal on passenger train operations and frequencies once the $3.6b (Rail Fallacy applying of course)  CRL was opened and under way. You can get a full recap at my CRL TIMETABLE AND OPERATION PLAN – PART TWO post. In this post I build upon the proposed frequencies from Part Two and apply what potential capacity the Auckland Passenger Rail network could have post CRL. Now remember as of current in my proposals I have three lines of operation – they are: …

 

Parts Four and Five have been in the pipeline since Part Three and should be up for “publishing” sometime in February (Part Five as soon as the RPTP is finalised). Part Four would look at a Manukau to New Lynn “shuttle” via Glen Innes and Britomart as well as preparing for the Manukau (Rail) South Link) with Part Five looking at a dummy timetable post CRL but factoring in any changes with the Regional Public Transport Plan.   The CRL Timetable and Operational Plan series will be used in lobbying and advocacy once Auckland Transport starts drawing up proposed operation plans for the trains once the CRL is operational.

As for the North Shore Line two posts were dedicated to this crucial project as well as mentions in submissions to The Auckland Plan:

NORTH SHORE RAIL FOR $2.5B?

Could We See Rail on The North Shore?

 

A QUESTION FOR THE CRL – Is the CRL Future Proofed for The North Shore Line?

…one thing has struck me – well two actually:

  1. No mention of The North Shore Line (which crosses the City Rail Link at Aotea Station)
  2. No apparent future proofing of Aotea Station for The North Shore Line when it gets built (that is when not if folks)

 

Including aspects of The North Shore Line are crucial as part of connecting “all” of  (metro) Auckland to the rail system. Both North Shore Line posts spell out the importance of the CRL as well as The North Shore Line. As time goes on I will write-up a Timetable and Operation Plan – Post North Shore Line with all the lines built and what such a timetable could look like for Auckland.

So interesting and exciting times ahead as advancements in one aspect of Auckland’s Fully Integrated Transport System (or Suite) continue slowly but surely.

 

[All City Rail Link posts can be found by typing “City Rail Link Debate” into blog search box]