All Three Requests Acknowledged. Now Awaiting Formal Replies [Update] An update on where things are with three Local Government Official Information and Meetings Act (LGOIMA) filed with … Continue reading LGOIMA Update [Updated]
All Three Requests Acknowledged. Now Awaiting Formal Replies [Update] An update on where things are with three Local Government Official Information and Meetings Act (LGOIMA) filed with … Continue reading LGOIMA Update [Updated]
My Alternative CRL Operations Plan after Auckland Transport Dropped Newton Station In my City Rail Link Operations MK2 I had noted Auckland Transport altering the City Rail Link insofar as dropping Newton … Continue reading City Rail Link Operations MK2 Full Version
Are we prepared though? Note: I am not interesting in the foreign ownership debate that the following article covers over Lochinver Station. This blog post is looking at Stevenson’s … Continue reading Interesting Industrial Future for the South
Changes to proposed CRL Operations Plan after Auckland Transport drops Newton Station In light of the recent changes made by Auckland Transport to the proposed City Rail Link … Continue reading City Rail Link Operations MK2
Dusting off the old Operations Proposal in light of Auckland Transport’s latest on the CRL In light of the recent changes made by Auckland Transport to the proposed … Continue reading City Rail Link Operations – A Review
Auckland Transport: “Acknowledged the problem had yet to be fully diagnosed – let alone fixed.” Continued coverage of our Electric Train and Rail System Fault that caused a 10 … Continue reading Electric Train Fault Believed to be Found. No Idea on Fix Yet
Investigation TO get under-way From the lack of notifications lighting up my Twitter feed right now would be an indication that the Electric Trains are running on the … Continue reading Latest Updates on the Electric Train Grounding Saga
Operating but there were delays I am still carrying out my usual checks on the Electric Trains running on the Onehunga Line after they went back into full … Continue reading Update on Onehunga Services Today
Bit of activity around the changes to the City Rail Link this morning in order to scale back costs.
From the Office of the Mayor
Mayor announces 20 percent cut in cost of City Rail Link
Auckland Mayor Len Brown has announced a significant reduction in the cost of the City Rail Link (CRL) from $2.86 billion to less than $2.4 billion lowering the price of Auckland’s number one transport infrastructure priority by about 20 per cent.
A significant part of that cost reduction is an Auckland Transport (AT) decision to redevelop the existing Mt Eden Station and connect it to the CRL rather than build a new underground station at Newton.
That design change will save more than $150 million, improve the reliability and journey time of train services, minimise construction disruption and reduce property purchase requirements.
The other significant saving is a decision that additional electric trains will not be required as part of the core CRL project, saving more than $330 million.
Len Brown says the ongoing review of the design and costs for the project shows we can get the CRL operational using the existing fleet. It is expected new units will be required for the CRL’s future developments, as the network expands.
“This is an exciting development and makes a 2016 start date for the construction of the CRL even more realistic, especially at a time when more and more people are choosing to get out of their cars and travel by rail*,” says Mayor Brown.
“Aucklanders are behind this, the business and investment community are behind this, we just need to get on and get it done.”
Mayor Brown said he expects more good news on the cost of the project to come as optimisation, value engineering and advances in tunnelling technology are taken into account.
*The year to June 2014 saw a 13.9% increase in Auckland rail patronage, to 11.4 million trips.
—ends—-
More coverage can be seen at the following:
Auckland transport project overhauled
AT drops Newton Station for cheaper CRL
And from Todd Niall at Radio NZ this morning
The text version can be seen here: $500m cost cut in Auckland rail plans
More on this later today including sending in a Local Government Official Information and Meetings Act request on the post CRL operating plan
Time to find out the cause of the “intermittent power fault” Source of photos is credited. Click photos for individual credits Yesterday after Auckland Transport grounded the Electric … Continue reading LGOIMA Request on its way to Auckland Transport on the Recent Electric Train Fleet Grounding