Auckland Transport and Public Transport

Slick New Video on our Public Transport

 

If it was not for Budget 2013 and that Much-Ado-About-Nothing Accord causing grief in Auckland I would of gotten this post up yesterday. None the less Auckland Transport has released a rather slick video on how IT sees public transport post 2016. This is covered in the Regional Public Transport Plan (RPTP) and is stuff I have commented and submitted on before.

Take a look at the video from Auckland Transport which can be seen at their “New Public Transport Network” page.

 

Also take note of these wee facts:

Benefits of a simpler connected network will include:

  • Services at least every 15 minutes on the frequent network
  • Easier to understand
  • Access to more destinations across Auckland
  • Reduced waiting times

In October 2012, Auckland Transport called for Aucklanders to have their say on the future of public transport in our city. A total of 719 submissions were received on the draft Regional Public Transport Plan, which included the proposed new structure for Auckland’s public transport network. Approximately 70 per cent of submissions supported the proposed direction taken.

This schematic map of the proposed frequent network (PDF 250kb)includes the Southern, Eastern and Western rail lines, the Northern busway and high-frequency bus routes connecting major centres. This map shows only services (bus, rail and ferry) intended to operate at least every 15 minutes, 7am – 7pm, 7 days a week. Services will continue to operate outside these hours at lower frequencies. Other ferry, local bus and peak bus services will also operate.

 

I have not agreed or disagreed with what AT are proposing at this point and time. But, as mentioned earlier I have submitted and attended hearings on the RPTP thus far with another round of consultation coming next month.

Previous commentary and my presentation can be found at:

 

As also noted AT is beginning the next round of RPTP consultation starting with the south

Areas ​Consultation ​Implementation
South Auckland 19 June 2013 to
2 August 2013
Mid – end 2014​
North Auckland​ Early 2014​ Mid 2015​
Central, East and West Auckland Late 2014​ Mid 2016​

 

Also please take note of the Auckland Council Transport Committee and its deliberations over the RPTP at its Wednesday meeting:

 

So let see if proof is in the pudding after the next round of consultation with AT on public transport

 

As for things like the Manukau South Rail Link, Glenora Road Station, Electrification to Pukekohe, and Grade Separation of rail crossings which are all hot button topics and priority wants in the South; WORKING ON IT – still.

 

BEN ROSS : AUCKLAND

BR:AKL: Bring Well Managed Progress

The Unitary Plan: Bringing Change

Auckland: 2013 – OUR CITY, OUR CALL