Category: General

Everything else

First New EMU Unveiled

Our First Electric Train Unveiled

 

Yesterday Mayor Len Brown and Auckland Transport head Dr Lester Levy unveiled our brand new first Electric train at the new Wiri Depot.

I will let Matt from Auckland Transport Blog do all the “speaking” from his experience yesterday at the event: Our First Electric Train.

 

What I will make mention of is the planned roll out of the new EMU’s across the Auckland network over the next two-year period. From ATB who got it from Auckland Transport:

Essentially from what I have learnt (and this can change so Auckland Transport if I do have this next bit wrong can you let me know and I shall correct it ASAP) this will be the roll out plan Line by Line:

The roll out of the EMU’s is the following:
1) Onehunga Line 
2) Manukau Line 
3) Southern Line and Eastern Line 
4) Western Line 
5) Pukekohe (this is dependent on when Pukekohe gets electrified (if it is done by the end of next year then Pukekohe will join the Southern and Eastern Lines at number 3)

The Onehunga Line was chosen first as it is the shortest line to test the new EMUs on. Then the Manukau Line is next soon after that.

The reason those two lines were chosen first was two-fold:
1) Retire the ADK class DMUs from the fleet first up
2) Free up the ADL DMU’s for Pukekohe runs and extra Southern Line runs

The West is last as they have the DFT 6-car sets which hold the most passengers in the diesel fleet. As more EMU’s come on stream the DC-4 (and 5) car sets will be sent west to add more frequency until all the EMU’s are here to replace them.

——-

 

Of course with Pukekohe due to be electrified (and two new stations added in that area (Drury and Paerata), the City Rail Link on its way, the Mt Roskill Spur Line under active consideration, and the Manukau Rail South Link due to be reported on in November I think Auckland might want to be taking another option of 15 more EMU’s to give some residual capacity (especially if we start top-and-tailing the consists to get EMU-6 car sets). But I suppose we will have to wait and see what “options” Auckland Transport take on more EMU’s.

 

In any case, can not wait to ride on these new machines once they are in operation from Papakura.

 

 

Not All Alone

Unitary Plan Formal Notification is Decided Today

 

Bernard Orsman said in his article in the NZ Herald this morning that Mayor Len Brown (who is seeking re-election) was “Brown all alone in action on plan.” Taking stock on the last three years as well as the next three years I wonder if it will be parts of the Isthmus and North Shore that will be left all alone in their Snow Globes.

I have mentioned before how the South and the West are preparing to march into the 21st Century with urban development while the parts of the Isthmus and North Shore will remain our err 1950 Snow Globe pieces.

However, despite all the banter, gnashing of teeth, shilling of the minority and (to be fair) some rational intelligent debate the Unitary Plan is set for formal notification today.

Here is the Agenda and Addendum agenda

The Main Agenda

 

The Addendum (Containing the Unitary Plan)

 

So two major items on the agenda today:

  1. Setting the date for formal notification of the Unitary Plan
  2. Preparing for the Special Housing Areas – which needs the Unitary Plan to be notified for them to become “operative”

 

And so the next stage of the “Long War” to bring Auckland into the 21st Century is about to begin. This stage being a three year “campaign.” It will not be easy as our Snow Globes resist the advancement with everything they have but it will be done!

 

As for Orsman’s article well I was taught in my Liberalism papers that ‘democracy often caters to the lowest common dominator‘. It was implying to shill politics adherent to democracy – as a negative of that particular system (all systems have positives and negatives). Unfortunately I have no confidence in Palino having a grip on the Unitary Plan otherwise he would have not made those remarks comparing L.A to Auckland. Shill politics folks…

 

As the Governing Body prepares for Unitary Plan formal notification I will be drawing up my own thanks with regards to the Plan

 

TALKING AUCKLAND

Talking Auckland: Blog of TotaRim Consultancy Limited

TotaRim Consultancy
Bringing Well Managed Progress to Auckland and The Unitary Plan

Auckland: 2013 – YOUR CITY, YOUR CALL

 

Unitary Plan Updates Day 4

And Auckland Just Got Sent Back to the 1960’s

 

I will post a full update tomorrow on Day 4’s proceedings which did not even get to the Rural Urban Boundaries.

In short after the gains we made getting Auckland to the 1970’s on Friday, Councillors and Local Board Chairs (some in each category) managed to send Auckland straight back to the 1960’s (it would have been 50’s if Councillor Brewer’s last amendments did not get defeated).

And so the question to those Councillors and Local Board Chairs: Where are the houses going to go? Because they will not all fit in the 160,000/40% Greenfield allocation within the Rural Urban Boundary – less Manukau, New Lynn and Albany can get some impressive 26-36 storey towers to take the brunt…

 

My report (scathing as that will be) will be up tomorrow. None the less it has given an extreme sense of urgency to the Manukau Super Metropolitan Centre and getting that set up for the South.

 

Unitary Plan Updates – Day 3.1

An Update from Auckland Council

 

From Auckland Council on the last three days of Unitary Plan proceedings

Council progresses towards Proposed Unitary Plan 

Councillors and local board chairs have wrapped up the first three days of decisions on changes to the draft Unitary Plan. 

Key parts of the plan, including residential zones, affordable housing, business zones, parking, the Port and the City Centre were covered at the meetings. Changes were discussed for each topic and the majority of issues resolved. 

Residential zones were the major focus of the discussions. Decisions were reached on all of the residential changes except for one proposal regarding greater flexibility for density on sites larger than 2,500 sqm in the Mixed Housing Suburban Zone, which will be revisited next week. 

Auckland Plan Committee Chair, Penny Hulse says “We have had three days of robust debate, discussions and decision-making. The involvement of the local board chairs has been extremely valuable in these discussions and I am pleased with the progress we’ve made.” 

Some of the key changes decided at the Auckland Plan Committee meetings included: 

  • Further reclamation for the Port to be a non-complying activity and a stage 2 study to be undertaken
  • Require all residential development of 15 or more dwellings to include at least 10% of dwellings as retained affordable housing
  • On 1200 sqm (or more) sites in the Mixed Housing Suburban Zone, a maximum of one dwelling for every 200 sqm
  • Residential developments of five or more houses will require a six star Homestar energy rating
  • Primary and secondary schools will now have a special purpose school zone

 

Additional Auckland Plan Committee meetings will continue next week to discuss the remaining issues on the agenda.

—Ends—

 

Due to the prolonged debate over the Residential Provisions thanks to the now defeated Councillor Hartley/2040 Auckland amendments to the Mixed Housing Zone, we have an extra two days of Unitary Plan proceedings. They are as followed (subject to any other possible updates:

Monday 2 September

The proposed issues for discussion are as follows:

  • Historic Heritage and Special Character
  • Zoning
  • Heights in Centres
  • New Growth
  • Rural

Thursday 5 September:

The Auckland Plan Committee meeting is likely to continue into Thursday 5 September. All remaining issues will be discussed.

 

I will not be at either of those proceedings at this point and time. However, where possible I will keep an eye via the All About Auckland video feed as I did yesterday.

My own commentary on Day Three’s proceedings will be posted tomorrow.