Equal Treatment Applies I have a warning to the Councillors and the Mayor of Auckland Council in light of the Port of Auckland saga coming to a head last week … Continue reading Be Warned Auckland Council Governing Body
Equal Treatment Applies I have a warning to the Councillors and the Mayor of Auckland Council in light of the Port of Auckland saga coming to a head last week … Continue reading Be Warned Auckland Council Governing Body
Then again June looking not particular better either The May Rail Performance figures for the Auckland network are currently out and do not make for happy reading. Below are the … Continue reading May 2015 Rail Performance. In the English Language we call this an Omnishambles!
Linear design the acceptable design for a Metro-type bus station I see the vaunted Christchurch bus station which is of a saw-tooth design has had a few err hiccups. … Continue reading Note to Auckland Transport: This is Why You Do NOT Build Sawtooth Bay Bus Stations
As well as truck lanes in a residential area And We do not even know the land use within the next 30 years Auckland Transport and NZTA are again seeking … Continue reading HOT TOPIC: SURPRISE – A Motorway is Back. East West Connections Feedback Sought
Consortia in place for enabling works I was forwarded this piece from (NZ) Contractor Magazine yesterday afternoon for a read. Below is an introductory extract: Auckland’s missing link JUNE 12TH, … Continue reading The Missing (Auckland Transit) Link #CRLFacts
Thales to replace batteries after driver injured
From Auckland Transport
Consoles on Auckland’s bus fleet are being modified after an incident yesterday in which a driver was taken to hospital with facial injuries.
A malfunction within a console, which is used to store ticket and route information, caused a plastic casing to fly off, injuring the driver.
The fault was with an internal lithium battery.
Thales Australia, which installed and maintains the machines, recommended they be replaced with upgraded batteries, which have a short-circuit fail-safe. Technicians are being flown in and the new batteries will be fitted on buses by Saturday.
AT also wants Thales Australia to look at modifications to the console casings.
Incidents involving faulty batteries of this type are rare worldwide.
“We don’t believe this is a systemic issue but rather a freak accident. Thales have never had any experience of an incident like this and they advise the possibility of a similar event is extremely low, and reduced even further with the latest fail-safe battery” says AT’s Chief Executive, David Warburton.
Since the machines were installed last year, Auckland’s 1150 buses have travelled an estimated 46 million kilometres (or approximately 1.9 million hours on the road).
Mr Warburton has also expressed concern for the bus driver involved whose welfare is being looked after by his employers.
—ends—
Write this story This morning the Eastern Line packed a sad as an Electric train lost power causing cancellations and delays in the morning peak. What information went out in … Continue reading This Is What Auckland Transport Thinks of You the… Yeah Again
Traffic would show Southern End needs investment first not the Northern End The Redoubt Road-Mill Road Corridor upgrade by Auckland Transport (note: the upgrade is the northern end of … Continue reading Is Auckland Transport Focusing on the Wrong End of Mill Road
More issues for the Auckland Rail Network this evening with a digger cutting the signal cable at Otahuhu.
As of now (when the post was written) from limited Auckland Transport Tweets Eastern Line services are terminating at Syliva Park or running to Manukau while the Southern Line covered by the diesels are running every 20 minutes (timetable suspended again). But Tweets are infrequent and no presser to the media or the blogs on the situation. Auckland Transport must be “too busy again” to deal with it (This Is What Auckland Transport Thinks of You – The Rail Passenger [UPDATED])
I was forwarded this link and it seems rather apt:
Time to forget Government and do the Auckland Transit Link (CRL) Ourselves? With the Government continuing to dither of its contribution to the Auckland Transit Link (the City Rail … Continue reading Ben’s Thoughts: What if Auckland Could Build the City Rail Link Itself? #Auckland2016