Tag: Public Transport

The Karaka Collective Presentation

Musings on the presentation

 

I have been meaning to get this piece up onto the blog for a while about the Karaka Collective presentation recently. I have not got the Physical Powerpoint presentation on me but, will chase it down from the Collective and upload it to the blog ASAP.

 

On May 13 at Karaka Hall, Peter Fuller representing the Karaka Collective gave a presentation of the Collective’s “submission” and vision for Karaka West and Karaka North. This also included the Weymouth-Karaka Bridge which seems to be causing enough upset from both sides of the harbour.

I have been asked for comments on the meeting as I was there. These are my thoughts and some responses to queries I got asked which covered both the physical presentation and the subject matter at hand:

 

The meeting in itself was civil and hats off to residents knowing the issue is both passionate and a sore issue (for both Karaka and Weymouth).
For the presentation it was too long and should have only be at maximum 10 minutes for the matter presented. Anything beyond a 20 minute mark in presentations and you lose the audience. I nodded off at the 20 minute mark to which I decided to go over and start talking to Councillors Fletcher and Penrose on the matter at hand.

I would have recommended to follow what is called a split presentation when giving a talk on material that can be quite heavy or quite extensive.

The split presentation format I used for the Auckland Plan Committee last week in my Manukau Presentation ( https://voakl.net/2013/05/15/the-manukau-presentation/ ) had both a short power point presentation covering the main points and a “booklet” with all the information at hand.

Both the presentation and the booklet is sent to the committee in advance for advanced reading leaving me to go over briefly the main points of my argument. The committee with the booklet in hand then asks questions they might have. It was a useful technique and allowed maximum time for the main purpose; questions or what I like to call dialogue if executed properly.

Peter Fuller should have split the presentation with both a short 10 minute brief covering the main points, followed by a booklet with all the finer details for further reading – and had it released a week in advance. Bloggers like myself would have picked up on this and both republished the information and ran commentary on it.

Although in saying that there is a risk of preempting the Collective’s presentation of information and allowing the residents to form questions before hand. Or allow bloggers like myself to take control of a debate and frame the argument. Risks but risks the Collective will have to take if they want their plan to progress. Also something a particular Herald journalist and elected representatives on the North Shore find out too when they get debunked for utter misrepresentation of information. So the remedy is simple; tell the truth from the beginning and you have nothing to fear. Tell a porker and don’t expect much forgiveness from people nor bloggers in return. The Collective were being honest and their ambitions known.

While the material in Fuller’s presentation was too long and too heavy with the presentation too full of planning and officialdom jargon. It could also be taken that the information presented in a way that was talking down to everyone in the room. So a patronising effect that will chill residents and elected representatives

As for the questions they were pretty good, as for the answers they were not. Fuller was okay with the answering but the other two that were land owners I had real issue with. Their answers were put in a way of both putting down the room and issuing a challenge to the room to “meet them” in the Environment Court which is likely where this issue will end up. I have taken note from Brigid her comment which was (it is public):

“I was at that meeting and there seemed to be a difference between how Bruce Wallace envisioned a Weymouth-Karaka link and what Peter Fuller showed in his presentation. Bruce Wallace seemed to be wanting de facto motorway that would get him quicker to and from the airport and lower congestion on SH1 so he could get to work in under 20mins. However Don McKenzie the traffic expert on the Collective team said any Weymouth-Karaka link would not lessen congestion. And Peter Fuller spoke of a 60-80k Te Irirangi Drive/Te Rakau Drive equivalent. ”

 

This folks is what you call an effective “Buggers Muddle” – that is a pile of different answers that basically contradict each other to the point oxymoron becomes the norm. Three different answers that would have three very different consequences on that particular bridge. Not entirely confidence material nor helpful for both Auckland Transport and NZTA if they ever decided to run with the project. So lets look at the points individually:

 

  • Bruce Wallace seemed to be wanting de facto motorway that would get him quicker to and from the airport and lower congestion on SH1 so he could get to work in under 20mins.

Umm no and won’t happen. Auckland Transport and NZTA would have to overcome hell and high water from Southern Auckland to get a de-facto motorway put in and the bridge built. The Benefit Cost Ratio would be below 1.0 owing to the massive environment (physical and social) consequences (mainly negative) to the entire area of the de-facto motorway proposal. The “motorway” would not lower the congestion on State Highway One especially when the Greenfield areas get built up. The only way to bet congestion on State Highway One is to 6-lane the motorway all the way to Drury interchange, get the rail service more effective and efficient, and development some large employment centres close to home (Manukau, Wiri and Drury). If one wants a quick trip to the airport then may I suggest throwing your support and money behind the Airport Line from Manukau Station to the airport. Coupled with the EMU’s you could be there in well 30 minutes without the traffic crap on the roads…

 

  • However Don McKenzie the traffic expert on the Collective team said any Weymouth-Karaka link would not lessen congestion.

Excuse the language but No Crap Sherlock. It will not lessen congestion any where. All that bridge will do is cause rat running through an established community causing misery and literal hell. Yes I see Weymouth has the strip to allow a 4-lane road but it is now too late for the road. That road and bridge should of been built 50 years ago to 4-lane specifications before Weymouth took firm settlement. The settlement could of then be built around the road and bridge rather than the community now being built around the road. As I said the only way to lessen congestion is what I mentioned above. Through in a proper Regional Public Transport Plan and I would say you could remove all together 33% of the cars off the road at a minimum while still allowing transit choice

 

  • And Peter Fuller spoke of a 60-80k Te Irirangi Drive/Te Rakau Drive equivalent. “

So an expressway option. Last I looked that the communities around Te Irirangi Drive were built in a way that they were mitigated from the most serious aspects of that road. That is the road was built around the community with green shelter belts and lane ways to access the houses (that is no house has a direct driveway access to Te Irirgani Drive in the new sections of that road). The older sections at the Manukau end of the road and along Te Rakau Drive which do have direct driveway access to the road show the implications of planning not done properly. What we see in the older sections of Te Irirangi Drive with direct driveway access rather than green belts and lane ways off the road is what we would get in Weymouth. Not fun for the residents nor particular safe for an 80km expressway either… It is of note that the Manukau end of Te Irirangi is at 60km/h while the new Botany sections are at 80km/h. That 80km/h section has the greenbelt and lane ways shielding the houses from the road. I wonder if the Collective would be willing to stump the cash up to retrofit Weymouth Road with those lane way shields if they want their bridge built. Probably not, so I wouldn’t want a 80km/h expressway either without the proper mitigation in position FIRST.

In regards to Bruce Wallace (seem to remember him rather well for some odd reason), I don’t particularly care if one has had issues with the old Councils. Most of us would have had crap from the legacy Councils so we know what it is like (Manukau Station being a pet peeve for me with the old Manukau City Council that I am still trying to fix up with the current Council). But what I do care is them short circuiting the RUB process and apparently trying to buy their way into outcomes favouring them via the Unitary Plan.

I did ask the final question for the night regards to the Collective supporting existing and new infrastructure projects before backing the Weymouth Bridge. Those projects include Glenora Road Station, Spartan Road Station, the Manukau Rail South Link, the RPTP with the bus routes and so on. While they said they would and might have done so (meaning I need to dig up submissions), I highly doubt it unless they prove me wrong over the next 7 years.
In saying that I am working on my submission to stave off that bridge as long as possible through a formation of a new regional park on the Karaka side. This has been mentioned before in this blog before

The submission will go up on my blog as soon as its finished.

Otherwise the meeting was handled well by the residents from a group short circuiting the processes the rest of us have to go through via claiming it is for the good of Auckland.

 

 

Those were my thoughts in the presentation. As I point out to the Collective, those ARE MY THOUGHTS AND INTERPRETATIONS of that presentation. If the Collective differs to my interpretations they are free to share a guest post – that is less than 2500 words and in plain English. Graphics help and can be facilitated easy into the blog.

 

In the mean time people do not forget your submission to the Unitary Plan in before May 31 – 5pm

 

 

 

Auckland Transport and Public Transport

Slick New Video on our Public Transport

 

If it was not for Budget 2013 and that Much-Ado-About-Nothing Accord causing grief in Auckland I would of gotten this post up yesterday. None the less Auckland Transport has released a rather slick video on how IT sees public transport post 2016. This is covered in the Regional Public Transport Plan (RPTP) and is stuff I have commented and submitted on before.

Take a look at the video from Auckland Transport which can be seen at their “New Public Transport Network” page.

 

Also take note of these wee facts:

Benefits of a simpler connected network will include:

  • Services at least every 15 minutes on the frequent network
  • Easier to understand
  • Access to more destinations across Auckland
  • Reduced waiting times

In October 2012, Auckland Transport called for Aucklanders to have their say on the future of public transport in our city. A total of 719 submissions were received on the draft Regional Public Transport Plan, which included the proposed new structure for Auckland’s public transport network. Approximately 70 per cent of submissions supported the proposed direction taken.

This schematic map of the proposed frequent network (PDF 250kb)includes the Southern, Eastern and Western rail lines, the Northern busway and high-frequency bus routes connecting major centres. This map shows only services (bus, rail and ferry) intended to operate at least every 15 minutes, 7am – 7pm, 7 days a week. Services will continue to operate outside these hours at lower frequencies. Other ferry, local bus and peak bus services will also operate.

 

I have not agreed or disagreed with what AT are proposing at this point and time. But, as mentioned earlier I have submitted and attended hearings on the RPTP thus far with another round of consultation coming next month.

Previous commentary and my presentation can be found at:

 

As also noted AT is beginning the next round of RPTP consultation starting with the south

Areas ​Consultation ​Implementation
South Auckland 19 June 2013 to
2 August 2013
Mid – end 2014​
North Auckland​ Early 2014​ Mid 2015​
Central, East and West Auckland Late 2014​ Mid 2016​

 

Also please take note of the Auckland Council Transport Committee and its deliberations over the RPTP at its Wednesday meeting:

 

So let see if proof is in the pudding after the next round of consultation with AT on public transport

 

As for things like the Manukau South Rail Link, Glenora Road Station, Electrification to Pukekohe, and Grade Separation of rail crossings which are all hot button topics and priority wants in the South; WORKING ON IT – still.

 

BEN ROSS : AUCKLAND

BR:AKL: Bring Well Managed Progress

The Unitary Plan: Bringing Change

Auckland: 2013 – OUR CITY, OUR CALL

 

 

Catch Up

After a Busy Day

 

Another one is in store

 

Yesterday was a busy day for me in the CBD with the Manukau as The Second CBD presentation to the Auckland Plan Committee, and the Generation Zero Unitary Plan Youth Event. Monday night was the Karaka Collective presentation on the Karaka North and West Rural Urban Boundary and THAT bridge which I also need to write up on.

As a result I need to catch up on a few emails and blog post of the events, as well as what is coming up next with the Unitary Plan

 

BR:AKL Commentary will cover today and tomorrow:

  • The Karaka Collective Presentation on Monday night (must request the presentation from Peter Fuller)
  • The Manukau as the Second CBD of Auckland presentation to the Auckland Committee
  • The Resolutions of the Orakei Local Board on Special Character Zones
  • The Generation Zero Unitary Plan Youth Forum
  • Post May 31 Consultation on the Unitary Plan
  • And for a Transport Issue – the Transport Committee discussing the Regional Public Transport Plan (RPTP)

 

BEN ROSS : AUCKLAND

BR:AKL: Bring Well Managed Progress

The Unitary Plan: Bringing Change

Auckland: 2013 – OUR CITY, OUR CALL

 

Lesson From Melbourne

Auckland Transport: Take Note

 

Saw this via my Twitter feed a few moments ago:

Fare evaders allowed to do a runner

Michelle Griffin

 

Yarra Trams has ordered its inspectors not to pursue fleeing or aggressive fare evaders after a spate of attacks.

In an internal Yarra Trams memo obtained by 3AW, dated March 2013, ticket inspectors are told they:

  • Must not block the path of, or attempt to physically detain a person who attempts to walk/run away.
  • Must always maintain a safe distance between themselves and a person being spoken to – if possible.
  • Must not surround or corner any person being spoken to regarding an offence under the Act.

The edict was issued after 10 assaults on ticket inspectors on trams between January and March this year. According to a Yarra Trams spokesman, this is “slightly higher” than the number of assaults at the same time last year, and resulted in 15 minor injuries, such as sprains and bruises.

The edict effectively ensures that those who refuse to give their name and address and instead flee cannot be detained or fined.

This comes just as Public Transport Victoria orders an increase in tram patrols by inspectors, in an attempt to cut fare evasion to 7 per cent across the public transport network.

There have been several aggressive confrontations between inspectors and passengers reported in recent years.

Read more: http://www.theage.com.au/victoria/fare-evaders-allowed-to-do-a-runner-20130426-2iid2.html#ixzz2RWdwDPO7

 

This is happening in Melbourne while we have this per Campbell Live: “SERIOUSLY AUCKLAND TRANSPORT?” that I covered recently. No wonder why Councillor Mike Lee is jumping up and down red and blue in the face. But in acknowledgement and balance: Dr Lester Levy of Auckland Transport is actively working on this situation – a man I can trust as a ratepayer to sort what is best for both AT/Rail and the city (AUCKLAND TRANSPORT TO RE-THINK STRATEGY).

 

But Auckland Transport – take note of Melbourne please SO WE CAN AVOID Melbourne’s situation…

 

 

The RPTP – Round Two

Next Round of Consultation with the RPTP

 

Bit of a break from the Unitary Plan this morning as I cover my perennial favourite topic: Auckland Transport (in particular public transport). Four days ago Auckland Transport released a full update post-hearings of the Regional Public Transport Plan (RPTP) which I both submitted and later presented in Manukau.

For a recap you can see my following RPTP posts on my submission and presentation

 

As a result of the hearings in February Auckland Transport has released a 57 page report on those hearings. You can read the report in the embed below:

 

I have not had a chance to read the document yet as such (busy with The Unitary Plan) however, take note of this:

 

When will the RPTP be formally adopted by Auckland Transport?

Auckland Transport has made significant progress towards the adoption of the draft RPTP.  Since the submission period closed:

  • We have successfully completed public hearings on the draft RPTP
  • After considering all the submissions received, the Hearing Panel presented a report to the Auckland Transport Board (the Board) recommending changes to the draft RPTP
  • In March 2013 the Board endorsed the changes to the draft RPTP recommended by the Hearing Panel.  This enables Auckland Transport to proceed with detailed local consultation on the proposed new public transport network for Auckland, a key element of the Plan.

 

The Land Transport Management Amendment (LTMA) Bill is currently before Parliament for approval.  Once the LTMA Bill is enacted by Parliament, the RPTP will be altered to ensure it is compliant with the new Act.  We envisage that any changes to what the board has endorsed will mainly relate to procurement issues.  Only once compliant, will the RPTP be formally adopted by the Board (expected to be later this year).  This delay is necessary because the new Land Transport Management Act will repeal the Public Transport Management Act under which the current draft RPTP was created.

 

Once formally adopted, we will inform submitters and make the final RPTP available for the public to view.

 

Local consultation on the proposed new public transport network for Auckland

Consultation on the proposed new public transport network for Auckland (the New Network) has been broken into 3 areas, with South Auckland being the first area to be consulted on.  Please see over the page the proposed consultation and implementation dates for the New Network.

 

 

Areas ​Consultation ​Implementation
South Auckland 19 June 2013 to
2 August 2013
Mid – end 2014​
North Auckland​ Early 2014​ Mid 2015​
Central, East and West Auckland Late 2014​ Mid 2016​

If you would like further information on the proposed New Network please visit our consultation webpage www.aucklandtransport.govt.nz/newnetwork, or email us at busreview@Aucklandtransport.govt.nz

 

Further information on the RPTP

To view further information on the RPTP; such as a copy of the draft RPTP, an electronic copy of the Hearing Panel’s report, or the hearings minutes please visit our consultation websitewww.aucklandtransport.govt.nz/rptp

 

So it seems I am back up for another round of consultation with the Public Transport Network (PTN) from June to August. I better brush up on my reading before submitting the next round of feedback (which is thankfully after the Unitary Plan).

 

Meantime I recommend a bit of brushing up as well with the PTN if you want a network that better serves you…