Tag: Auckland Transport

Chicken or The Egg

What First with Transport

 

And

 

Do We Hold The Key to Better Transport?

 

The Herald ran a rather academic story on transport this morning and its relationship with the human body. To be honest the article is rather heavy for this time of year and looks like something err geeky from the blog next door. You can see the Herald article in the link below:

We hold the key to better transport

Some forms of getting from A to B are badly affecting the health of humans.

Incorporating the human body into transport design and planning could save millions.

 

We demand and expect our transport systems to get us where we want, when we want to be there, and as fast as possible. We are, however, human beings. And as with any other built system, we have to ask whether our fast and efficient modes of travel are necessarily always good for us.

And it goes on…

 

However when it came to solutions, yes they are under way but with Auckland‘s case it has a long way to go:

From the same article

 

…

For all the human health impacts of the modern transport system, there are obviously substantial benefits in the form of greater economic productivity, vastly increased spatial access and mobility, and even health gains, such as increased ability to get preventive and other medical care.

All technology imposes health risks of some sort. So a purely negative focus on these is unhelpful. Nonetheless, it’s useful to ask whether our transport technologies, policies and investments are good for us. If not, we need to adjust and redesign our transport accordingly.

Positive changes, many of which are currently underway, include:

  • A greater focus on redesigning congested urban spaces to encourage walking and social interaction and to lower automobile use and speeds. This could achieve many health and safety outcomes simultaneously.
  • Traffic calming – a range of techniques ranging from speed humps to pedestrian malls which create attractive active transport environments.
  • Road pricing and increasing parking fees, or eliminating parking altogether to encourage public transport use and walking.
  • The expansion of bike-share schemes, where public bicycles can be rented and dropped off from multiple locations.
  • Further safety improvements to automobile safety design for new car models.
  • Prioritising action on “black spots” on roads and highway “geometrics”, which includes improving lines of sight at intersections and around curves.

These reforms need not involve costly or radical overhaul. Road safety used to be a neglected policy; small but significant changes there have saved millions of lives. A broader incorporation of the human body into transport design and planning could save millions more.

 

Urban design and continued evolution of vehicle mechanics will go someway in addressing a more integrated system where transport and urban design are interwoven rather than treated separately as they are now. However the chicken and egg analogy comes up for the point I highlighted in bold: Road pricing and increasing parking fees, or eliminating parking altogether to encourage public transport use and walking. 

It is a case of do we slap on road pricing and increased parking fee measurements to build an adequate mass transit system that people would take as first choice rather than a forced choice (as of current), or do we build the mass transit system and get that running up first before slapping in the road pricing measures. It is actually a tough question and one who would have to provide a very good justification to the tax paying public no matter which of the two options they take.

 

But sadly Auckland seems to be in a bit of bother at the moment with is road and (in this particular case) mass transit systems. Take this article piece from the Herald (the post I have on it is sitting on ice at the moment):

Experts called in to fix rail slump

By Mathew Dearnaley

5:30 AM Friday Dec 21, 2012

Auckland Transport is resorting to professional help for a strategy on how to stop losing patronage from trains and buses. Chief operations officer Greg Edmonds has promised to provide his board with a plan early next year on how to staunch bleeding which saw a 17.2 per cent decline in train boardings last month compared with the previous November. That followed concern raised by Auckland Council transport leader Mike Lee, which was acknowledged by new board chairman Lester Levy, about a need to lift service performance. Mr Lee said patronage, which was boosted last year by the Rugby World Cup, started “flat-lining” in March and the organisation was starting to see a distinctive downward trajectory. “I don’t think this is sustainable without Auckland Transport intervening in a decisive way,” he said. “One of the measures of quality is punctuality or train performance and, while the price of our services is high, quality tends to be poor consistently.”

…

Mr Lee said the board, on which he is a council appointee, had been assured a new timetable would improve rail performance and that the rollout of the new Hop transport card on trains would combat fare evasion. But the board heard that train punctuality deteriorated last month to 84.1 per cent of services running to schedule, compared with 87.1 per cent in October, and he said rail staff were having difficulties stopping free-riding passengers. He had been told of fare evasion as some people were presenting their Hop cards to train staff to avoid paying their way. This did not apply to Britomart or Newmarket, which have become gated stations. “Busy, harassed train managers trying to collect fares are shown a Hop card and they move on,” he said. “The person may have paid $5 [in a since-expired half-price opening deal] for a card and, according to rail staff, they are using it to evade fares. “There are electronic checkers but they are slow and cumbersome and there’s not enough of them.” Dr Levy said he agreed there was a need for “critical measures” to be adopted and Auckland Transport needed to be far more customer-led in creating a demand for its services. “From the board’s point of view, this won’t go away – it’s the number one issue,” he said.

 

I think at this rate Auckland will be some way off before coming to the Chicken and Egg question on new infrastructure (which is where the point in bold above comes in) when we can’t even get the basics right on existing infrastructure.

 

Hopefully our transport planners and politicians will have some time to think over the summer holidays and have a solution, however as my iced post would stipulate; that might be asking for Mission Impossible. So in that case “WE” might be very well holding the key to better transport!

 

LGOIMA Request Out – Manukau Car Park

Local Government Official Information and Meetings Act Request on Manukau Public Car Park is Out

 

 

Recently I had filed a Local Government Official Information and Meetings Act request to Auckland Council over the business case for the now Auckland Transport owned and operated Manukau City Centre Public Car Parking Building:

Time for a Local Government Official Information and Meetings Act Request

 

It is time to file another Local Government Official Information and Meetings Act request to the Auckland Council. This time the LGOIMA request will be on the recently opened Auckland Transport public car park building in Manukau which I reported on this morning. The request I will be filing will be for the originalbusiness case presented to the former Manukau City Council (under Mayor Len Brown) on this $14m building before it was carried over as a legacy project by today’s Auckland Council.

I am curious to what the business case was for this parking building in trying to understand why the former Manukau City Council went ahead with this project and possibly why Auckland Council did not stop it.

I’ll be keeping the readers up to date on the request – whether it is accepted or rejected by Council officials.

But in any case it is time to take a peek and what was the methodology behind the construction of this parking building in Manukau City Centre! 

 

And so the information requested has come in today and is posted (as four attachments) below.

 

 

This is the revised version

 

 

 

 

Now I am still reading the documents, but on first glance I think we have just been sold down the road initially with this building if we do not get any more high density development around Manukau soon (the Manukau South Rail Link adds another dynamic to the mix as well).

 

However check this out from AT’s website in the Ronwood Avenue Parking Building:

Ronwood Avenue car park

Last reviewed: 10/12/2012 11:55 a.m.

Car park location: Corner Ronwood and Davies Avenue, Manukau  – entrance from Ronwood Avenue

Parking description:  Multi-storey parking facility with a Vehicle Height Clearance of 2.1m. Eight levels with 676 spaces.

Car park features:

  • System for quick and easy parking (space availability signage by level)
  • Well lit
  • Clean and tidy
  • CCTV cameras that link through to a central control room monitored by security personnel.

 

Contact us about this car parking facility, or if you require immediate assistance in the car park building, press the blue “assistance” button located on the payment machines.

Hours  |   Tariffs  |  Lease Parking  |  Debit Card  |   Parking Vouchers  |   Ways to Pay  |

Normal operating hours 

​Day of the week ​Opens ​Closes
Monday to Friday 6.00am​ ​9.00pm
​Saturdays, Sundays and public holidays ​Closed ​

Note: Customers can park their cars in the building for 24 hours or longer, but can only exit before the last exit or opening times. See Other Parking rates to work out the cost of leaving your car overnight. For example, should you park your car in the building after 5pm on Friday night, and remove it on Monday morning at 6am, you will pay the $5 evening rate for each night it is in the building ($15 in total).

 

Tariffs

The following tariffs are a guideline only and subject to change. Refer to the schedule of fees at the car park entry.

Casual parking (Monday – Friday)

​Casual parking ​ ​ ​
0 – 1 hour​ ​$1 1 – 2 hours $2.00
2 – 3 hours $3.00 3 – 4 hours $4.00
4 – 5 hours $5.00 Max daily rate​ $6.00
* Lost ticket fee​ ​$40.00 ​ ​

* If customer loses their parking ticket, an instant $40.00 fee will be charged to be released from the car park.

 

Other Parking

Other parking​ ​Tariff ​Times & Conditions
Early bird parking​ $4.00​ Weekdays only

Enter and pay before 9.30am

Availability during this time is on a first come basis until full​

Levels 1 and 2 only

Evening rate​ $5.00​ Enter after 5.00pm – valid until 6.00am (following morning)

One entry, one exit

Pay at the machine​

​Lease Parking

Monthly lease deals (incl. GST)

See application forms for lease parking

 

 

 

 

 

 

 

 

 

 

 

 

 

​Concession

$150.00

Level 3

No reserved allocated space -“first come – first served”

Global concession

$360.00​

​
Reserved allocated (undercover)

$250.00

Level G​
Reserved allocated (external)

$160.00

Level G​
Reserved unallocated

$200.00​

Level 4
Debit card​ Coded for denominations $20.00 to $200.00.

Rechargeable.​

Contact us for more information
​Parking vouchers See casual rates above Available in 1,2,3 hour; half or full day periods, parking vouchers are used at the pay machine together with the entry ticket.

Request via fax or contact us ​

​Ways to pay Automatic payment machines can take Visa, Mastercard, Diners card and EFTPOS payments, as well as cash.

Help is only a button push away if required.

​

 

* If customer loses their parking ticket, an instant $40.00 fee will be charged to be released from the car park.

 

 

So what methodology was used? Love to seriously know

And I would really love to know how the diminished operating hours and parking tariffs compared to the original and revised Business Case studies are meant to assist in paying off the building as well as building a “sustainable” positive cash flow for Auckland Transport and Auckland Council. Now remember the parking building’s parking tariffs have already been slashed to these current levels to match or even underpin the All Day Park and Display street parking around Manukau. Even then that has not enticed people off the street and into the building (and it wouldn’t for me either).

I also have to ask, it is packed at Westfield Manukau Mall with Christmas shoppers and will be this weekend. Have AT even thought of opening the building this weekend to catch the overflow – you know a win-win for AT and Westfield? Probably not. So while you the shopper go round and around looking for a park, you have a perfectly empty dead parking building just sitting there – NICE ONE AUCKLAND TRANSPORT!

 

Why does Cabbage Boat come to mind here folks.

 

More in this business case later.

Advancement in Rail

Pukekohe Electrification Builds Steam,

 

While

 

City Rail Link is Safe

 

 

Okay the subtitle for this post – Pukekohe Electrification Builds Steam is a nice play on words seeming the trains will be electrics, not steam engines.

Puns aside I managed to attend the back-end of the Transport Committee today after attending the first part of the Papakura Local Board meeting this morning. As I walked into the Transport Committee meeting this morning I must have just come into a pile of excitement and some Auckland Transport “moments” as there was quite a pitched debate going on. Now with the AT moment – I shall cover that in another post but for the moment let’s talk Pukekohe.

 

It has been mentioned since I reported on the November Transport Committee that steam is building (all hail the English language) to get the rail line from Papakura (where the current electrification will end) to Pukekohe electrified, as well as building two new stations at Drury and Paerata – both complete with bus bays and Park and Ride facilities. Now the cost of this project stands at $102m and has a Benefit Cost Ratio of 2.1. So for every dollar put in, you get $2.10 in investment return. Now for more on the actual project, please read the agenda below AND the case for Pukekohe Electrification also below.

 

Now apart from Councillor Casey’s sidetrack into the V8s in which depending on class of train, you can move between 284-700 passengers per train between Papakura to Pukekohe (answering that question of hers) the Transport Committee has thrown their full weight behind the Electrification and Station building project which (as Councillor Fletcher put it) an exciting moment for those in Counties (and in part South) Auckland. Now of course at $102m, Auckland Transport and the Council Strategy and Finance Committee (who oversee all things money within Council) are going to have to err rearrange budgets and finances to get the project within the current (oh I hate this saying – thanks Ruth Richardson) 2012-2022 Long Term Plan Fiscal Envelope. That is unless a special request is done to lug the project in there and seek extra money from the ratepayers – a move not wise as it creates precedent and makes the LTP a redundant exercise.

So Council and AT are going to have to have a long conversation on all things money as something from the budget is going to have to be dropped or put back. Nasty I know but hey, even Rebekka and I have to do it to our budget and finances at home when a capital project comes up outside the standard project – something else in that budget is just going to have to be put back.

 

However the wheels of progress are turning and fail the Governing Body doing a total back-flip, we should see the electrification extended to Pukekohe by 2018. Exciting times ahead

Oh any chance of squeezing in the $4m Manukau South (Rail) Link to be included with this project – just asking.

 

As for the City Rail Link

 

Ladies and gentlemen, I can safely say and be personally reassured that the City Rail Link is safe on the Council side of things (Central Government is something else) and that the project will advance from the Council side – although what exact time frame won’t actually be known until around 2014 when the new Council is installed and up and running. Now this is of course we do not get a total flip-out on Council and have every single new Councillor anti-rail.

However conversations I have had has given me this personal reassurance that the CRL will advance – subject to Central Government funding of course and that this project is supported by the majority of the Centre Left and Centre Right despite rumblings in the media and social media.

I am pleased ideology is being put behind in a particular case and that pragmatism and forward vision is rather in play instead. And whoever did release that draft report which curtailed the CRL has probably done more harm than good out of the exercise, so I am not particularly impressed and neither are others.

 

So we go forward and work continues on this multi-billion dollar mega project. Yes there are questions and work still be needing to be answered and done – but at least come hell or high-water this critical project continues to advance.

 

I give a nod and thanks to a particular individual for giving me that reassurance – for that I am thankful for (and I believe the city would be as well).

 

Agenda for Transport Committee – December 2012

 

Pukekohe Electrification Case

Summer Holidays

Getting Ready for a Summer Holiday

 

Summer is here, Christmas is three weeks away and 2013 now being four weeks away. And as so businesses and civic institutions close down and people go away on holiday.

Apart from Christmas day itself I will be working through the holiday season and will be taking Annual Leave again in March next year as Rebekka and I head to Australia for our holiday. But in that regard BR:AKL will also be on Summer holiday too from December 21 until Wellington Anniversary weekend (somewhere mid January) before firing up again next with more of that commentary and analysis, plus the campaign to Papakura Local Board 2013.

 

However before we all go, just a couple of things cropping up at the moment as the year winds down:

First being tomorrow’s Auckland Council Transport Committee in which you can go read all 220 pages in the embed down below. I shall be present at that Committee meeting keeping an eye on proceedings and hopefully catching up with a couple of Councillors and wishing them a Merry Christmas and Happy New Year.

The second thing being is that I still have one Local Government Official Information and Meetings Act request outstanding in the Manukau Parking Building that I am awaiting the information from Auckland Transport. I am also in the process of writing up another LGOIMA request on a particular issue I have been keeping a close eye on.

And the last thing being is that I have finished reading the report into our Upper North Island Ports (including Port of Auckland). I shall write commentary up on that in the New Year including continued pushing for having the port moved down the South East coast.

 

So hope your Christmas preparations are all going well – and here is the 220 pages of all things transport in Auckland (seeming most of us are going to be stuck on the roads one point or another in the run up to these holidays)

 

 

THE ACHILLES HEEL OF C&R – CTD

Open Schism in C&R Exposed

 

And so I go trundling through Facebook and Twitter this morning (as I usually do) and I notice this crop up which links to an article from Bernard Orsman and the NZ Herald:

Council duo attack rail link spend

By Bernard Orsman

 

C&R ticket divided on Mayor Brown‘s $2.86 billion policy, with some comparing it to a ‘black hole of Calcutta‘.

 

Spending on rail in Auckland has been compared to a “black hole of Calcutta” as right-leaning councillors take an increasingly strident line against Mayor Len Brown’s $2.86 billion city rail link.

Communities & Residents councillors George Wood and Dick Quax are openly contradicting their ticket’s policy of support for the rail link by saying it does not stack up and calling for a halt.

C&R leader and rail supporter Christine Fletcher is playing down the divisions in the caucus, saying Mr Wood and Mr Quax have always had “extreme” views and the ticket is a broad church.

Mrs Fletcher insisted the C&R policy of supporting the rail link and land purchases, but not approving a start on construction until funding is in place, “was the policy” and had the backing of candidates chosen for next year’s local body elections.

The views of Mr Wood and Mr Quax – half the C&R caucus of four councillors – have hardened in the past week with the release of a Horizon Research poll showing 64 per cent of Aucklanders support the rail link and a leaked report saying rush-hour traffic in central Auckland will slow to walking pace in 10 years without the rail project.

Mr Quax said the rail project made little sense because it would gobble up 80 per cent of the public transport capital budget over the next 10 years when much-needed bus lanes and ferry terminals received a “paltry” 20 per cent.

“The Government has made it quite clear that it does not see the central rail link as a transport priority project. The numbers don’t stack up. For every dollar it returns just 40c and will only remove 1400 cars per day from the road.”

Mr Wood said he supported the project “sometime in the future”, which Auckland Transport said could be 2025 and the Government 2030, subject to it being financiallyviable.

“Rail is a ‘black hole of Calcutta’ and is soaking up 80 per cent of the public transport budget and costing ratepayers around $461 million over the next three years,” he said.

“There is a lot to be done in other areas before we get into sucking all the lifeblood out of Auckland into this one project.”

Centre-right and independent councillor Cameron Brewer is also becoming increasingly concerned about the cost of the rail link after initially supporting the project and work to secure the designation and buy properties along the 3.5km underground route.

Mr Brewer said he had yet to be convinced about the cost and benefits of the project, including the benefits to nearly 90 per cent of Aucklanders who do not work or live in the CBD who may have to pay for it through tolls or a regional petrol tax.

Mr Brown did not want to comment about C&R’s internal wranglings on the rail link, but said he could not see how councillors could ignore the latest poll.

“The poll showed overwhelming support for the city rail link and integrated bus and rail improvements to public transport across Auckland.”

Rail wrangle

•C&R councillors George Wood and Dick Quax blast the $2.86 billion rail link
•C&R leader Christine Fletcher says the ticket supports the link
•Mayor Len Brown points to a poll showing 64 per cent support

 

Did I not ask the last week to Communities and Residents (C&R) for a UNIFIED Policy Statement on the City Rail Link? I think I did in this particular post: THE ACHILLES HEEL OF C&R. With the question being in that post: “Is Communities and Residents (C&R) Actually Unified?”

Well if you read the article above, I think the answer is a firm ‘NO!’ Especially after the language exchange from Councillors’ Wood, Quax and C&R Council Leader Chris Fletcher…

 

And so where am I going with this?

Well if we want to avoid this parody below I think it might be seriously time to take the broom out, brush out the cobwebs and inject some new blood into Council. And by new blood I mean electing no-one that has served on a legacy Council prior to the current Auckland Council.

Yes that picture still gets the laughs every time someone goes at posts it.

 

But in any case, can Auckland really afford a fractured Council in the most pivotal period of our future (2013-2016). Pivotal meaning that what ever Council does in 2013-2016 will affect Auckland quite easily for the next 50 years. So no pressure there folks 😛

 

A schism has been exposed in the primary (heck that is loose when they only hold 19% of the voting power in the current Council) centre-right party “ticket” which can result in being the catalyst to a fractured Council after the elections next year. It is something I clearly do no want, and nor does Auckland!

I have warned aspirant Councillor Cameron Brewer about the City Rail Link on Facebook:

Cameron Brewer, I had noticed this after C&R developed a schism that the ratepayer has noticed: “Mr Brewer said he had yet to be convinced about the cost and benefits of the project, including the benefits to nearly 90 per cent of Aucklanders who do not work or live in the CBD who may have to pay for it through tolls or a regional petrol tax”

That argument about the CBD can be shot to pieces by anyone from the Centre like myself OR the Centre-Left with a simple and slick marketing campaign that would have Auckland Transport envious on the City Rail Link. This resulting in the Centre-Right’s flank being awfully exposed in the campaign next year.

I might go an expose that flank now in a post of mine and see where we go over the next 10 months

 

So as ratepayers and voters next year we have a collective decision to make; do we bring in a unified and progressive Council that will take us forward for the next 50 years, or a fractured Council that will cause us to backslide in the mud for the next 50 years.

 

Again as candidate to the Papakura Local Board in next year’s Local Elections you can check my baseline policies and stance on the City Rail Link

 

2013 – Your City, Your Call