All Three Requests Acknowledged. Now Awaiting Formal Replies [Update] An update on where things are with three Local Government Official Information and Meetings Act (LGOIMA) filed with … Continue reading LGOIMA Update [Updated]
All Three Requests Acknowledged. Now Awaiting Formal Replies [Update] An update on where things are with three Local Government Official Information and Meetings Act (LGOIMA) filed with … Continue reading LGOIMA Update [Updated]
My Alternative CRL Operations Plan after Auckland Transport Dropped Newton Station In my City Rail Link Operations MK2 I had noted Auckland Transport altering the City Rail Link insofar as dropping Newton … Continue reading City Rail Link Operations MK2 Full Version
Restoring the Great South Road I saw this last week on Twitter: 18: What if Great South Road truly was great?! pic.twitter.com/ls4NONzMz4 — Stuart (@HoughtonSd) July 28, 2014 I was … Continue reading What If: The Great South Road Lived Back Up To its Potential
Investigation TO get under-way From the lack of notifications lighting up my Twitter feed right now would be an indication that the Electric Trains are running on the … Continue reading Latest Updates on the Electric Train Grounding Saga
Time to find out the cause of the “intermittent power fault” Source of photos is credited. Click photos for individual credits Yesterday after Auckland Transport grounded the Electric … Continue reading LGOIMA Request on its way to Auckland Transport on the Recent Electric Train Fleet Grounding
I have seen a bit of activity, chatter and news going around about our Electric Trains. If you are wondering why they are not running at the moment on the Onehunga Line my Electric Train Fleet Grounded [updated] post gave the heads up on it.
An extract from TVNZ stated:
Fault prompts electric train replacement on Auckland network
Published: 1:15PM Wednesday July 23, 2014 Source: ONE News
A power fault has led to Auckland’s new electric trains being replaced on the Onehunga Line.
Auckland Transport has stressed the faults had not resulted in any safety issues.
The power fault has occurred twice in the last 24 hours and while it could take several days to fix timetables will remain unchanged.
Auckland Transport chief operations officer Greg Edmonds says the organisation intends to get to the root of the issue.
“So as not to inconvenience customers we have decided to run diesel units,” he says.
Mr Edmonds also says issues such as this are expected while phasing in a new train fleet.
….
——
Source: http://tvnz.co.nz/national-news/fault-prompts-electric-train-replacement-auckland-network-6036157
After some checking and some chats in regards to the EMU fault I came up with a theory into what MIGHT be causing the issues with our electric trains that has resulted in the grounding of the fleet. Now I stress this is a theory in what possibly might have occurred from deductions and observations. Naturally when such a theory is presented the relevant authority would carry out tests to either prove or disprove the theory. Now we know according to Auckland Transport’s Chief Operating Officer Greg Edmonds that equipment is being installed on the two substations that feed the juice into the electric network for the trains to see if they can find the fault. I hope they do however, I theorise that the fault while found, it can not be remedied if Auckland Transport and Kiwi Rail have done cost cutting with the infrastructure thus we will have continual issues until the proper remedy is in position.
Our New Electric Trains Breaking Down in Peak Services? [Updated])
http://www.bettertransport.org.nz/forum/viewtopic.php?f=1&t=2460&start=2760
http://www.bettertransport.org.nz/forum/viewtopic.php?f=1&t=1653&start=3520
Power quality
From Wikipedia, the free encyclopedia
Power quality determines the fitness of electrical power to consumer devices. Synchronization of the voltage frequency and phase allows electrical systems to function in their intended manner without significant loss of performance or life. The term is used to describe electric power that drives an electrical load and the load’s ability to function properly. Without the proper power, an electrical device (or load) may malfunction, fail prematurely or not operate at all. There are many ways in which electric power can be of poor quality and many more causes of such poor quality power.
The electric power industry comprises electricity generation (AC power), electric power transmission and ultimately electricity distribution to an electricity meter located at the premises of the end user of the electric power. The electricity then moves through the wiring system of the end user until it reaches the load. The complexity of the system to move electric energy from the point of production to the point of consumption combined with variations in weather, generation, demand and other factors provide many opportunities for the quality of supply to be compromised.
While “power quality” is a convenient term for many, it is the quality of the voltage—rather than power or electric current—that is actually described by the term. Power is simply the flow of energy and the current demanded by a load is largely uncontrollable.
Mr Edmonds said special measuring equipment had been installed at both of the electrification system’s two power supply substations, and on the trains themselves, ready for simulated services to be trialled last night.
Power quality issues (so dirty power) also give harmonics issues which have been mentioned before again here: http://www.bettertransport.org.nz/forum/viewtopic.php?f=1&t=2460&start=2760 (I think one page back from where that one will open). More on harmonics can be seen here: http://en.wikipedia.org/wiki/Harmonics_(electrical_power) (extract below)
Harmonics (electrical power)
From Wikipedia, the free encyclopedia
Harmonics voltages and currents in an electric power system are a result of non-linear electric loads. Harmonic frequencies in the power grid are a frequent cause of power quality problems. Harmonics in power systems result in increased heating in the equipment and conductors, misfiring in variable speed drives, and torque pulsations in motors. Reduction of harmonics is considered desirable.
…
Effects
One of the major effects of power system harmonics is to increase the current in the system. This is particularly the case for the third harmonic, which causes a sharp increase in the zero sequence current, and therefore increases the current in the neutral conductor. This effect can require special consideration in the design of an electric system to serve non-linear loads.[2]
In addition to the increased line current, different pieces of electrical equipment can suffer effects from harmonics on the power system.
Motors
Electric motors experience losses due to hysteresis and losses due to eddy currents set up in the iron core of the motor. These are proportional to the frequency of the current. Since the harmonics are at higher frequencies, they produce higher core losses in a motor than the power frequency would. This results in increased heating of the motor core, which (if excessive) can shorten the life of the motor. The 5th harmonic causes a CEMF (counter electromotive force) in large motors which acts in the opposite direction of rotation. The CEMF is not large enough to counteract the rotation, however it does play a small role in the resulting rotating speed of the motor.
And that is my theory behind the situation resulting in the costly grounding of our electric train fleet. The theory stems from the simple fact that currently only two of the four or five substations that would feed the electrified rail network power as well as filter the power to prevent dirty power and over voltage have been built. We only have 50% of the total supply potential and filtering (or protecting) capacity installed for a 25,000 volt system. Thus because of the reduced capacity to filter, protect and supply we get these problems with just SIX electric trains running let alone the full 57.
So the question is what will Auckland Transport do? The remedies that I have seen are quite costly if we are to prevent the entire EMU revenue service fleet being pulled again like last week.
Something that could have been in theory very easily avoided!
You have until August 6 If you love your community and want to have a say on how it will be shaped over the next three years then … Continue reading Don’t Forget to get Your Local Board Plan Submissions in
Government wants “loopy” regulations gone As Transport Blog quite rightfully said and as I have noted in my various submissions over the last four years in winding back loopy planning … Continue reading So How About our Centre Right Councillors Being With the Government
Someone opposed my submission As the Further Unitary Plan Submission period closes today I had some emails come up in my inbox alerting me someone has filed a … Continue reading Unitary Plan Counter Submissions
Not quite talking about Auckland though Some urban planning with a difference: Solaria my mega city housing 3,025,000 sims. Below is some random screen grabs of the different “tiles” … Continue reading Another Day in Mega City Development