Tag: transportation

The Push for a #MovingAuckland

Generation Zero Writes

 

(In the Herald that is)

And so an “opinion” piece crops up in today’s Herald on Auckland Transport Blog and Generation Zero’s Congestion Free Network alternative – a proposal TotaRim Consultancy Limited supports.

The piece in the Herald today is fitting with ATB due to give a technical presentation to the IPENZ transport chapter at the old Auckland Regional Council (now BECA) building tonight. I have RSVP’ed to the event tonight and will be in attendance observing the presentation. Commentary will follow tomorrow on the presentation.

The following opinion piece written by Generation Zero leader (one of many) Sudhvir Singh opens as follows:

Sudhvir Singh: Generation Zero’s transport vision

Adding more services to public system will encourage Aucklanders to use it, writes Sudhvir Singh.

 

The Auckland city rail loop is one step towards a balanced transport system.

EXPAND
The Auckland city rail loop is one step towards a balanced transport system. Credit: NZ Herald

Auckland’s transport plan provides us with a once-in-a-generation choice between two competing visions: to keep pursuing the failed model of motorway-driven sprawl, or to develop a quality, compact city with a balanced transport system.

 

Generation Zero, with the respected authors of Auckland Transport Blog, have developed a fully costed, visionary alternative to the current $60 billion transport plan: the Congestion Free Network.

 

We propose the staged investment in public transport corridors all over the region, with high frequency all-day services. These corridors would include electrified rail to Mt Roskill and Pukekohe, busways to Silverdale, Kumeu and Botany, rail to the airport, light rail along Dominion Rd, an extensive ferry network and even rail to the North Shore. And all of this at only 40 per cent of the cost of the current transport plan.

 

A full regional cycling network would complement this system, as well as focused upgrades on specific local roads. This would provide Aucklanders with genuine transport choice.

 

By contrast, the council’s current plan to deal with Auckland’s growth over the next 30 years is set out in its Integrated Transport Programme (ITP)…

You can read the rest of it over at the Herald site.

 

I did though tail off that excerpt with the mention of the current 2012 Integrated Transport Program that I have written off before and even called it a lemon.

Through that short reaction alone you can see why I would support a #MovingAuckland as part of a #BetterAuckland via the Congestion Free Network idea.

Bold, visionary, sorely needed and a gut-ser (in the mountain of NIMBYism from my parents’ generation (the main but not only source) as well as Right Wing sources that will soon come up against the CFN concept) needed for Auckland. I applaud what is being advanced here.

 

I have sort responses from Auckland Transport and the Office of the Mayor on the Congestion Free Network proposal. Responses have come back from Auckland Transport on the CFN idea.

Basically in regards to the city and its transport, any CFN concepts are most likely to be further researched and incorporated (whether in parts or as a whole) into the 2015 Integrated Transport Program. The 2015 ITP draft is due out for release for “our” consideration and consultation this time next year.

As for the Office of the Mayor, a response is on its way.

 

And so like #SuperManukau, the Congestion Free Network idea ( #movingauckland ) works its way slowly through the wheels and cogs of Town Hall.

 

More as it happens

 

 

Mill Road – South End Concerns

Auckland Transport Preparing for Investigation

 

After the recent uproar over the proposal for the Redoubt Road and Mill Road (north end) widening, attention now switches to the southern end of the Mill Road Corridor Project with Auckland Transport preparing an investigation into it.

The Mill Road Corridor Project is essentially creating a 4-lane south-eastern bypass route from Redoubt Road, down Mill Road, through east Papakura before finally connecting at Drury near the motorway interchange. The purpose behind this bypass is to allow for growth in the East Takanini and Papakura area, as well as an alternative to the Southern Motorway between Manukau and Drury (currently congested in peak hour).

Currently owing to the congestion on that section of Southern Motorway, there is a lot of rat running along Redoubt Road and Mill Road as workers head south to head home.

From Papakura Courier

Mill Road decision looms 

DUBBY HENRY

 

Homeowners in “limbo” over the controversial Mill Rd corridor could soon find out if they’re in the firing line.

The contract to investigate the second stage of the highway goes to tender in August.

 

The arterial traffic route is an alternative to State Highway 1 and will link Manukau and Flat Bush to Drury and the southern motorway through Papakura.

Planners will pick up where the Papakura District Council left off its investigations in 2010 but the routes are far from finalised, Auckland Transport spokesman Mark Hannan says.

 

The district council held meetings in 2009 with residents who were worried their houses could be bowled.

But it’s “too early to tell” if those same residents will still be in the path of development, Mr Hannan says.

 

The most likely route will head down Cosgrave Rd before doglegging around Cosgrove School and cutting through farmland to link with Dominion Rd, which is expected to be widened from two lanes to four.

The corridor is about 1.2km east to where I live and could cause rat running down the main road if people decide to use that as a bypass to Papakura or even the motorway via Elliot Street. The rat running would be a pain for myself trying to get to and from Papakura or the Papakura Train Station (until Glenora was built) so I am keeping an eye on this part of the corridor’s development.

From the Papakura Courier article again

After Dominion Rd the route will cut through Hunua Rd along several possible routes through Drury to get to the southern motorway, meaning residents around Waihoehoe and Fitzgerald roads could also see their properties affected.

I would see that part as the main feeder for the upcoming Drury South Industrial Park as trucks would use it to gain access to State Highway One

And he reckons it doesn’t make sense to create what will essentially be a second motorway on his street now the Government has announced it is to widen State Highway 1.

That would be true. Apart from maybe Hunua Road to State Highway One (so the southern most end) the rest of the project should probably be reviewed in light of the Southern Motorway upgrades.

Those upgrades which include the dogged Takanini Interchange should take a lot off pressure off that area. Putting the need for a 4-lane bypass back on the shelf and relieving some concerns for local residents. Sure Mill Road will need kerbing, intersection improvements, cycle lanes and maybe a bus lane or two but; not the full hog as we are seeing now.

The investigation is expected to take two years and there will be “full consultation” with residents, he says.

 

We all hold our collective breaths here folks

Happens When you Pigeon Hole a Debate

Why the CBG Failed at a cost of $1.5m of your money

 

[Note: CBG figure moved from $1.1m to $1.5m]

I already posted today on my consensus of No Confidence against the Consensus Building Group’s Final report based on a failed Integrated Transport Program. You can see that commentary here: No Consensus in Funding the Integrated Transport Program

In that commentary I did mention how the Mayor through the Auckland Plan and his brief to the CBG pigeon holed the debate into looking at basically one option: TAX! Whether that be an increase in rates (which is a property tax), petrol tax or road pricing (crude congestion charging). Left out were asset sell downs, a lottery, departure and bed taxes, and a regional sales tax.

Problem? The Government as widely expected blasted down what the Consensus Building Group “came to” with the opposition effectively doing the same although for different reasons (Julie Ann Genter’s piece for example).

In saying that the Government rather than looking at a regional fuel tax as part of suite of options, it has decided on a nation-wide petrol tax increase as a sole option which besides many other things will rightfully annoy the rest of the country!

 

By the looks of things as well the Government could “hint” at Council moving on its existing asset base to help pay for some the transport projects. But, again we have a problem. We have no idea on how the city truly feels towards the asset question nor the to lotteries (and other options) because the Mayor denied our democratic right to have an effective say via a submission – if the CBG were allowed to look at such a scope.

The Mayor’s ideology is to me irrelevant and can be kept at home. What I want is vision dosed with pragmatism and all options on the table for OUR consideration free of the mayor’s ideology.

One thing would have been for certain; if via the submissions to the CBG we overwhelmingly rejected the assets question then it could have been further ammo against Brownlee. However, we will never know that answer thanks again to the piegon holing by the Mayor.

And so we are stuck with really no options at all to the point it is the Worst of All worlds. Effective taxed out of existence…

Vancouver looks mighty fine at the moment…

Note: Answering a question from another article; The Consensus Building Group was stacked with effective lobbyists rather than professional consultants, civil engineers and Geographers (who look at the Physical and Human environments and consequences of our actions)

 

TALKING AUCKLAND

Talking Auckland: Blog of TotaRim Consultancy Limited

TotaRim Consultancy
Bringing Well Managed Progress to Auckland and in support of a #movingauckland

Auckland: 2013 – YOUR CITY, YOUR CALL

 

So Which Form of Mediocrity Would You Like Today?

Not Really Options for Transport as Purported by The Mayor

 

So with Mayor incumbent Len Brown kicking off his campaign the issue of transport got dragged up straight away. In other words how to pay for the 2012 Integrated Transport Plan that has caused a lot of teeth gnashing from all sides of the coin.

From The NZ Herald

Auckland drivers face off-ramp toll

By Mathew Dearnaley

 

Drivers may be tolled at Auckland motorway exit ramps to ease pressure on ratepayers over a $12 billion transport funding gap, according to a high-level report due out today.

 

The report, from a 17-member think-tank appointed by Mayor Len Brown, will give Auckland Council and the Government a clear timetable for when new revenue sources will be needed to raise an extra $400 million for each of 30 years.

 

The money will be for projects such as the City Rail Link and new roads, including another Waitemata Harbour crossing.

 

The plan is expected to include increases to fuel taxes and rates and possible charges for motorists to use existing roads from 2020, rather than just tolls now allowed on new government highways.

Well as already noted those going right through the city won’t be pinged so long as they stay on the motorway. As for the rest of us? The Great South Road and Mill Road sound better alternatives from Papakura to Manukau or Otahuhu that using State Highway one.

My point? This proposing on slugging the off ramps rather than certain points along the motorway and having an effective mass transit alternative is a case of the cart before the horse syndrome.

To make matters worse in Len pigeon holing the transport funding debate some options were eliminated from the scope in the feedback session by the Consensus Building Group (yeah an Oxymoron right there):

From the Herald again

That paper ruled out about 20 options such as assets sales, a regional sales tax and a lottery before leaving Aucklanders with a stark choice between hefty rates rises combined with fuel tax rises in one corner, and a combination of enhanced traditional funding sources and road charges in the other.

 

Although the Government is opposed to charging drivers to use existing motorways, it is understood the report will suggest tolls at the off-ramps to local roads, given that those are half-funded by ratepayers.

 

Long-distance travellers would be free to drive through the city without being charged, as long as they stayed on the motorways.

 

What was wrong having a good debate about those options in red? Probably not compatible with the Mayor’s ideology so he shuts them out of the debate entirely and pigeon hole’s into the more unsustainable options I could think of.

 

Least our transport workhorse (one of two) Councillor Mike Lee hits the nail on the head:

Council transport chairman Mike Lee said he believed Aucklanders were “more than paying their way” and he didn’t think trying to find more cash from them “is on right now”.

 

So a rejig of the transport priorities and funding allocations might be needed here first folks. Not much of chance that happening while the Local Government Elections now formally under way…

 

 

Time for Some Sim Unitary Plan

1.4 million people in a 16.7km2 Area?

Can I do it?

Yes I can

 

Cold crap winter’s Sunday mean lots of hot chocolate, the heater and time to crack out some Sim City 4.

The Mission: Develop this 16.7km2 piece of real estate:

The hole where I will design and build the new mega city centre
The hole where I will design and build the new mega city centre

The area is planned to be the main core for the region or rather MEGA city. So that mean maximum densities and a very efficient transit system to boot to move those Sims around.

 

The existing transit map (note it does not show subways)

And the transport networks
And the transport networks. Note the Black and Light Blue are both highways (motorways)

Going to be fun connecting the transit system from the surrounds up to the new area. Of note this is what I have to connect up:

  • 2 lane roads
  • 4 lane avenues
  • 6 lane raised and ground level motorways
  • heavy rail
  • subways
  • Elevated High Speed Rail
  • Ferries and a port in the north west end

Infrastructure wise

  • Fresh water pumps
  • Treatment plants
  • Pipes
  • Some high tension power lines at the beginning
  • Nuclear FUSION reactors
  • Waste Depots so the trash is sent “off map” meaning some deals with it next door if I don’t incinerate it at a Nuclear Fission plant else where on the fringes of the mega city

Of note when I last had a “city” in that piece of real estate it took 4 fusion reactors to power it 😛

 

And to show were I will be starting:

Blank canvas for my new CORE city
Blank canvas for my new CORE city

Last time I developed a walking city with 75% of the 1.4m sims either walking or taking mass transit. Impressive? Yep despite the also impressive rapid roading system that matched it.

 

So time to fire up and get going. If one is wondering I do have a A4 colour copy of the above pic’s where I do pencil in preferences to what goes where in the planning phases. So essentially I am do a Sim Unitary Plan first then let the developers and sims let rip.

Fun times ahead

 

Submission sent on New P/T Network (Southern Auckland)

Submission Sent to AT for Southern P/T Network

 

I finally wrote up and sent my feedback to Auckland Transport using the Online Feedback Form (no need for a 104 page monster this time round) today.

You can see what I exactly submitted on in the PDF embed below

I made no mention around the Te Mahia Station closing issue (which I support in closing) as that I will bring up at the Papakura Open Day this Saturday with the transport planners.

My primary feedback was around the good quality of the work drafted up by Auckland Transport on the Southern Public Transport Network proposal, and around the 365 and 371 bus routes which I would use once on stream.

I did suggest some changes to Routes 371 and 365 so that it takes into account Takanini Village and the proposed Glenora Road Station as potential stops. Some other changes and mention around off-peak frequencies were mentioned as well.

I did make a push for the Manukau South Rail Link again as part of the frequent transit network from Pukekohe and Papakura so that Southern Auckland gets a dedicated rapid and direct service to our biggest employment centre (in the south). The reasoning around that was a train from Pukekohe to Papakura to Manukau via the south link is faster than buses which would get caught in bottlenecks along the Great South Road (as well as stuck with 50km/h limits to the train’s 90-110km/h limits) and as hinted with speed limits actually faster than the bus. That also means faster than going to Puhinui Station by train and going through a clumsy transfer onto a Manukau Train from Britomart on a cold winter’s morning 😛

So let’s see where this feedback goes once AT starts its considerations on it all post August 2 (when the feedback closes)

You can see the Southern P/T Network over at AT’s webpage: New Public Transport Network

 

 

 

Transport Announcements

And Here We Go

 

The Prime Minister has announced what is effectively an ULTRA spend up on transport in Auckland for the next wee-while.

I am still working through the material and am most likely to post a full response tomorrow.

Also I am just re checking material I have written over the last three years. I don’t know if Council or Government has ever read my submissions in related to transport or not, I am not particularly fussed. But the CRL, the AWHC, AMETI and other things seem to be on a very similar timetable to what I suggested in my Auckland Plan submission:

From Page 49 of my Submission to the Auckland Plan

The Priority System

As resources and capital is scarce, a priority system is needed best allocate those scarce resources and capital to extend Auckland’s Transport System. This priority system in this submission will be brief with extended details provided in a separate submission to the Auckland Long Term Draft Plan.

 Priority One (To be completed by 2018)

  • Building of the Eastern Highway (to the Sub-Regional Standard Option as mentioned in Section 3.5 of the EASTDOR Final Report
  • Realigning the Westfield Diamond
  • Relocating or adding rail stations
  • Re allocating bus routes, improving bus feeder systems to rail stations or bus RTN systems
  • Feasibility Study of the Airport Rail Line including freight option
  • Starting the bus RTN roll out especially along State Highway 20, 20A and 20B
  • South-to-Manukau Rail Link Completion

Priority Two (To be completed by 2025)

  • Completion of Inner City Rail Link
  • Third Rail Line from Port to Papakura
  • Airport Rail Line (if deemed feasible)
  • Second Harbour Crossing
  • South West Rail Line (if freight is still moving to Northland)
  • Rail Electrification to Hamilton (not mentioned or included in this submission)

Priority Three (To be completed by 2040 or optional)

  • Botany Rail Line
  • North Shore Rail Line
  • Upgrade Eastern Highway from Sub Regional Function option to full Regional Function option

This priority system was created in attempt to create an idea on how transportation projects should be rationalised and built over the next thirty years with scarce resources and capital. Priorities can change as the transportation needs change for Auckland. Through creating the basic outline of the Auckland Transportation Network over the next 30 years, and through more technical analysis in the Long Term Plan Submission, it is hoped that Auckland’s transport needs will not virtually bankrupt the city and allow the city to be known again for its affordability and economic progress. Also the Auckland Transport Network ideas outline is designed to complement the LADU system also mentioned in this submission. The LADU system proposed in this submission is to allow the submission’s goal to be realised and affordability plus economic progress not be strangled by DURT!

You can see my original submission in the embed below.

As I said above I will comment in full later while I digest all this (and my lunch). You can see the initial Herald reaction HERE.

My Original Auckland Plan Submission (check page 49)